Projects
nav

Fast delivery EN steel grade S275JR material price

At the same time of doing well in EN steel grade S275JR material production and operation, Yunnan company focused on completing the four phases of technical transformation construction projects, realizing industrial upgrading, improving equipment level, and laying a good foundation for the future development of the company. In the EN steel grade S275JR material technological transformation project, pollution control facilities have been built synchronously, and a large number of comprehensive utilization projects, such as comprehensive sewage treatment and recycling project, blast furnace gas waste heat and residual pressure power generation, have been invested and constructed.

With the development of multimodal transport in the international shipping market and the increase of the complexity of the integrated transport chain, modern ports, as the intersection of the three transportation modes of sea, land and air, are developing from traditional transfer and product distribution functions to all-round value-added services, becoming the central link connecting the world's production, exchange, distribution and consumption, and supporting the world economy and international trade An important part of the developed international circulation system.

As the thickness and hardness of EN steel grade S275JR material increase, the tendency to crack at the cutting edge increases. In order to prevent the EN steel grade S275JR material from cutting cracks, preheating should be carried out before EN steel grade S275JR material cutting. Special attention should be paid to preheating to make the entire EN steel grade S275JR material interface evenly heated to avoid local overheating in the area contacting the heat source. If the whole EN steel grade S275JR material cannot be preheated, the partial preheating method can be used instead.

LSAW Pipe to Peru. In the beginning of 2014, Peru government released an international tender for one of the hydroelectric power plant. Finally they chose us as the contractor, we purchased the steel plate and then fabricate the EN steel grade S275JR material steel plate into steel pipe, and then make the corrosion protect on the surface, we also supply the fitting with our steel plate, the total value of this order is about 2 million USD.

BBNSteel boiler plate EN steel grade S275JR material for sale: 14*1510*4000, 14*2520*6000, 15.5*2900*12050, 15*2120*5620, 15*1780*6000, 14.5*2670*5600, 14*1530*6700, 15.5*2900*8400, 15.5*2030*10300, 15*3000*7800, 15.5*1820*6000, 14*3050*4000, 16*3000*10000, 16*1300*6000, 15*3000*7830, 15.5*2500*7100, 15*1740*8870, 17*3000*4900, 16*2540*5100, 15.5*2560*6900, 16.5*2720*4500.

we develop very well through those years even the external environment is not conducive to the whole steel industry. With the prosperity of our group, our company always bear its staff who contributes to its growth in mind, and always on the way to improve welfare and treatment. That makes us staff and work with pleasure. On the other way, they creat a better and stronger our group. That may be one of the key factors why we develop so rapidly those years. Here we can say proudly “we are family”.

Contact Us

Submit demands online

Please feel free to give you inquiry in the form below, We will reply you quickly.

  • OEM/ODM

    OEM/ODM

  • Delivery guarantee

    Delivery guarantee

  • Service guarantee

    Service guarantee

  • Quality assurance

    Quality assurance